Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 390 decisions within 5 km, 4 exact-site or onsite candidate records, and 27 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
27 structured nearby appeal records.
27 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Provision of an office/software development building together with on-site car parking, boundary treatments and all associated site development works
Provision of a single occupant commercial building consisting of warehousing, manufacturing, ancillary office space with staff and customer training areas, together with on-site car and bus parking, boundary treatments and all associated site development works
The development will consist of an extension to the existing commercial premises at Site 34, this includes an extension to the site boundaries, a new warehouse building with ancillary office space, provision of a connection to the existing building at first floor level, together with perimeter security fencing/walls, car and bicycle parking areas, landscaping and all associated site development work.
The development will consist of permission for 4 No. Light Industrial units in a single building, new vehicular entrance, perimeter security fencing/gates, parking areas, landscaping and all associated site development works at Site 33. Together with amendments to the Site 34 site layout plan, approved under ref: LB190419
The development will consist of permission for a new 7,519sqm light industrial manufacturing unit including, production areas, offices and welfare facilities, site security fencing and boundary walls with railings, new vehicular entrances, parking areas and landscaping together with all associated site development works. The proposal also includes for an amendment to the previously approved road layout of the Business Park, granted under planning Ref. 991130
The retention of the change of use from light industry to a church and associated ancillry rooms
The brief summarizes the pattern across all 390 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record LB190280The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief