Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 390 decisions within 5 km, 4 exact-site or onsite candidate records, and 27 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched1 of 2 layers are loaded for Meath County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
2 matchedOne current citation from the Meath County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Meath County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
27 structured nearby appeal records.
27 matchedCitations are current-dated and carry policy name, section, page and source URL from the Meath County Council development plan.
1 matchedOpen preview
Open preview
Provision of an office/software development building together with on-site car parking, boundary treatments and all associated site development works
Provision of a single occupant commercial building consisting of warehousing, manufacturing, ancillary office space with staff and customer training areas, together with on-site car and bus parking, boundary treatments and all associated site development works
The development will consist of an extension to the existing commercial premises at Site 34, this includes an extension to the site boundaries, a new warehouse building with ancillary office space, provision of a connection to the existing building at first floor level, together with perimeter security fencing/walls, car and bicycle parking areas, landscaping and all associated site development work.
The development will consist of permission for 4 No. Light Industrial units in a single building, new vehicular entrance, perimeter security fencing/gates, parking areas, landscaping and all associated site development works at Site 33. Together with amendments to the Site 34 site layout plan, approved under ref: LB190419
The development will consist of permission for a new 7,519sqm light industrial manufacturing unit including, production areas, offices and welfare facilities, site security fencing and boundary walls with railings, new vehicular entrances, parking areas and landscaping together with all associated site development works. The proposal also includes for an amendment to the previously approved road layout of the Business Park, granted under planning Ref. 991130
The retention of the change of use from light industry to a church and associated ancillry rooms
The brief summarizes the pattern across all 390 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record LB190280The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief