Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 582 decisions within 5 km, 1 exact-site or onsite candidate record, and 52 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
52 structured nearby appeal records.
52 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a new dwelling house, waste water treatment plant and percolation area including all associated site works and new site entrance. Significant further information/revised plans submitted on this application
The development consists of a two-bed, short stay holiday home and revised waste water treatment plant and percolation area from that previously granted permission under planning ref 25/60831 including all associated site works
The development consists of the retention of two number short stay holiday homes, as well as planning permission to decommission the existing septic tank and upgrade to a new waste water treatment plant and percolation area including all associated site works
The construction of a Medium Voltage (MV) substation building and associated underground cabling at Carranstown and Caulstown, Platin, Duleek, Co. Meath, to serve the OCGT development approved under Meath County Council Planning Reg. Ref. 23/60212 (ABP Ref. PL17.319278) [The approved OCGT development is a development that comprises or is for an activity requiring an Industrial Emissions Directive license and is also an establishment to which the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 (S.I. 209 of 1025) apply]. The proposed development will include (i) a Medium Voltage (MV) substation building (24 sq. m.) within the site of the approved OCGT development; (ii) a 20kV underground cable connecting the MV substation building to the existing 20kV line which runs alongside the R152 road to the north and also to the consented 110kV substation to the south (ABP Ref. VA17.303678); and (iii) a low voltage underground cable connecting the MV substation building to the onsite offices approved under Planning Reg Ref. 23/60212 (ABP Ref. PL17.319278)
Retention of a single storey rear and side extension and retention for the attic conversion for use as storage, including associated rooflights to the side & rear elevations. To include all associated site works
The proposed development will comprise a 170MW (electrical output) Open Cycle Gas Turbine (OCGT) Power Plant. The proposed development will comprise an electricity generating plant which will use Hydrotreated Vegetable Oil (HVO) as fuel and will be connected to a previously consented 110kV substation (ABP-303678-19) and associated site works and improved access from the R152. The development comprises the following elements: a) Three gas turbine buildings (each 990m2) each housing 1 no. turbine, 1 no. generator and auxiliary equipment with a total of 269 MWth (thermal output) generating capacity all on concrete plinths. b) The power plant will have three exhaust stacks (25m in height), one exhaust stack per OCGT. Therefore, each OCGT will comprise a standalone Large Combustion Plant. The power plant may need to utilise, selective catalytic reduction (SCR) (18m high, 4.5 width, 14m length) for nitrogen oxides abatement. c) Water treatment plant comprising: • a 275m2 Deionising Building (6m high x 11m wide x 25m long) • a raw water treatment tank of 2,262m3 ( 12.8m high) • a deionised water tank (max. volume of 3,925m3). 15.4m high • a processed water tank of 450m3 (9m high) • 1 no. 20m2 firefighting water tank of 45m3 (2m high) • 1 no. 25m2 firewater module (4m high x 5m wide x 5m long) • 1 no. 41m2 sanitary foul water cesspool tank of 79m3 located underground (1.98m high x 2.5m wide x 16m long) • a bulk chemical storage area (4.75m wide x 7.75m long) d) 2 no. HVO tank (max. storage of 2300 m3 of HVO per tank), 13m high with a diameter of 15m and associated fuel pumping and filtering equipment and pipework, within a 43.5m L x 45.5m W x 1.5m Bund capacity is 2970m3. e) 1 ammonia tank –1.8m high x 3.5m length with bund 2.5 m x 5 m with a height of 1.5 m. f) 1 no. fuel polishing system (3m high x 6m wide x 24m long). g) 2 no. 110 kV transformers each 160m2, and each measuring (5m high x 10m wide x 15m long). 3 no. Lightning Masts (18m in height) and kiosks,cable gantry connection to the adjoining consented 110 kV Substation. h) A 520m2 services building (6m high x 13m wide x 40m long). i) A 160m2 Switchgear (MV) building (5m high x 6.1m wide x 26.3m long). j) All other miscellaneous and ancillary site works, including: 12 no. Car parking spaces and 1 No. fuel unloading bay, one lowered site platform area, new internal roads and hard and soft landscaping including material berms (1.2m to 2m high), a temporary construction compound, temporary
The brief summarizes the pattern across all 582 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record LB190517The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.