Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 382 decisions within 5 km, 2 exact-site or onsite candidate records, and 28 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
28 structured nearby appeal records.
28 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(a) Construction of a milking parlour and assembly yard with an underground slatted tank. (b) Erection of a meal bin and water storage tank and all associated site works. Please note a Natura Impact Statement will be included in the planning application.
Conversion of garage to bedroom with new pitched roof, removal of render to original cottage to expose existing stonework, proposed fenestration and elevation amendments and widening to existing vehicular access along with ancillary works
The development will consist of permission to amend the design of the approved development (planning reference: LB171475) for an energy storage facility to provide services to the national grid system on the 2.8ha site, Comprising battery containers, combined power conversion system and transformer units, associated electrical infrastructure, fencing, access track, CCTV, ecologically beneficial landscaping, and associated ancillary development on lands in Causestown, Stackallen, Navan, Co. Meath., subject to 17 conditions. Amendments proposed are: - Two phases of development, proposed with the combined capacity of no more than 100MW. - Increase the life of the permission from 5 to 10 years to facilities phase 2. - Amend condition 11 of parent consent (Planning Ref: LB171475) to specify that any remedial road works if required as a result of the development shall be focused on the L3411 from Entrance A to N51 junction. - Amend condition 12 of parent consent (Planning Ref: LB171475) To allow for construction works to be carried out between 0700 and 1900 Monday to Friday and 0800 and 1600 on Saturday. - Increase from 24 to 33 smaller battery containers. 31 of which are orientated in a northwest to southeast direction, with the other two in the southeast corner oriented in an east-northeast to west-southwest direction. - Change from 24 large combined Power Conversion System (PCS) and transformer units to 40 much smaller individual PCS and transformer units. These will no longer be housed in containers but are externally mounted. - Addition of four Low Voltage (LV) cabinets. - Revised layout and size of the grid connection and compliance equipment within the storage area: - Change from a 500m3 underground surface water storage tank to a surface water storage pond, with stock proof fence and gate; - Spare parts container moved from the east to the southwest corner of the ESF compound; - Additional small section of temporary access track and cable trench in west corner for grid related works; - Increase in length of the Modular substation within the ESF. - Removal of Grid transformer off site to be relocated within the associated Grid Connection infrastructure (subject to separate planning application). - Addition of 2No. CCTV Cameras (a total of 7No. CCTV Cameras within the site). - Addition of 5 Security Light Columns
Construction of a two storey style dwelling with detached domestic garage, install a septic tank & percolation area and form new entrance from existing private lane with access to public road. Significant Further information/Revised plans submitted with this application
The development will consist of retention of: Ground floor area and first floor storage area to side of dwelling as an amendment to development previously granted permission under reference 98/547 along with all ancillary site works
The construction of a 2-storey dwelling, domestic garage, packaged wastewater treatment system with polishing filter, new entrance and all ancillary site works
The brief summarizes the pattern across all 382 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record LB190698The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief