Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 323 decisions within 5 km, 3 exact-site or onsite candidate records, and 15 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
15 structured nearby appeal records.
15 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The proposed development will consist of; (a) Change of use of part of existing barn for seasonal use as a function space, (b) Change of use of part of existing barn for use as a meat preparation unit (c) Proposed single storey extensions to existing barn to provide kitchen & additional space associated with the meat preparation unit (d) Associated parking & (e) Connect to existing services on site together with all associated site works. Significant further information/revised plans submitted on this application
EXTENSION OF DURATION OF PLANNING PERMISSION REF. NO. SA/120727 - works located within existing organic farm
The development will provide for the upgrade of the Slane Wastewater Treatment Plant and will generally comprise the following: construction of a storm water holding tank compete with cleaning system and access stairs; construction of a final effluent washwater pumping station; and all ancillary site development works including hard and soft landscaping
The upgrade of the Slane Wastewater Treatment Plant and will comprise the following: the demolition of the existing inlet works and the construction of a new inlet works complete with duty fine screen, manual bypass channel, grit removal system, installation of a GRP kiosk to house electrical control panel and all ancillary site works
Retention permission for existing extensions to original dwelling and existing part constructed detached outbuildings/sheds to rear of dwelling and planning permission to convert same into home office/domestic store, including all ancillary site works
The development will consist of proposed external thermal insulation with render finish to external walls of existing single storey dwelling, proposed single storey extensions to side and rear of same, new front porch, replace existing pitched roof of existing two storey extension to rear with new flat roof together with all associated siteworks
The brief summarizes the pattern across all 323 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record LB201231The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief