Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
18% of nearby decided applications were refused. The site check found 349 decisions within 5 km, 4 exact-site or onsite candidate records, and 22 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
22 structured nearby appeal records.
22 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development will consist of the importation of 230,000 m3 (345,000 tonnes) of Article 27 (as defined by European communities (Waste Directive) Regulations 2011) uncontaminated soil and stone as a non-waste by product over a five year period to improve 12 hectares of agricultural lands where: The further use of the stone is certain and will be used to recontour and improve the agricultural lands; The soil and stone can be used directly without further processing. The soil and stone will be an integral part of a production process i.e. soil will be excavated, moved to facilitate site development in accordance with Article 27 by a material producer or with the expressed written consent of a material producer and will be notifiable to the EPA as a by - product prior to its use on lands. The proposed further use of the soil and stone fulfils all relevant product, environmental and health protection requirements for the specific use and will not lead to overall adverse environmental or human health impacts. An Environmental Impact Assessment Report and a screening report for Appropriate Assessment accompanies the application. Significant further information/revised plans submitted on this application
The construction of a new bay within the existing Gorman substation, a remote substation compound with 2 CCTV Cameras and single security light and associated grid infrastructure, underground cables, permanent access track, temporary access track and flood attenuation pond, to connect to the neighbouring consented Energy Storage Facility (Planning Reference: lb171475). Significant further information/revised plans submitted on this application
The construction of a two storey residence, domestic garage, dog grooming parlour, dog kennels, proprietary waste water treatment system, new entrance and all associated site development works
The development consists of retention of a single storey detached garage and home office ancillary to the main dwelling and all associated site works
The construction of detached storey and a half residence, domestic garage, gym, dog grooming parlour, proprietary waste water treatment system, new entrance and all associated site development works
The construction a detached storey and a half residence, domestic garage, gym, dog grooming parlour, proprietary waste water treatment system, new entrance and all associated site development works
The brief summarizes the pattern across all 349 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record LB201327The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief