Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
17% of nearby decided applications were refused. The site check found 389 decisions within 5 km, 6 exact-site or onsite candidate records, and 26 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
26 structured nearby appeal records.
26 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The retention and completion of a domestic garage and Planning permission for a new dwelling and site entrance including all associated site works
Change of house number 26, 27 type E changed to type A; house number 32, 33, 36, 37, 42, 43 type D-E changed to type K (containing total of 12 dwelling apartments) and all associated site works. Changes to development previously permitted under Planning Permission no. LB170940
Construction of 45 dwelling houses comprising of 6 No. three bedroom terraced houses, 30 No. three bedroom semi- detached houses, 8 No. four bedroom semi-detached houses & 1 No. four bedroom detached house; all associated on and off site development works including outfall foul and surface water sewers including sustainable urban drainage systems, landscaping, boundary treatments, open spaces, play areas, combined pedestrian/cycle paths from Main Street and Chapel Lane and vehicular access from Main Street via The Maudelins complex. Significant further information/revised plans submitted on this application
Change of use from a gym to a child care facility catering for playschool, afterschool and full day care and operating Monday to Friday 7.00am - 6.00pm. Significant further information/revised plans submitted on this application
The construction of the following development: 1. Construction of 6 number two storey two-bedroom terraced houses; 2. The provision of both foul and storm water services to the proposed houses which shall connect into the adjoining housing development Maudelins Brooks, 3. The provisions of watermain services to the proposed houses which shall connect into the adjoining housing development Maudelins Brook. 4. For the provision of car parking facilities for the proposed dwelling. 5. For the provision of a pedestrian footpath which shall connect into the adjoining housing development Maudelins Brook. 6. For the provision of all public lighting. 7. For the provision of all boundary treatments to the dwellings and site boundaries and, 8. For all ancillary site works. Significant further information/revised plans submitted on this application
The alterations to the approved planning permission (reference number 21/1503). The alterations will consist of: 1. Permission to permit the dwelling houses to be made available for occupation by people with varying disabilities, who will reside in the dwellings, 2. For the omission of condition number 4 of the approved planning permission referring to Section 47 Agreement, 3. For the omission of condition number 6 of the approved planning permission referring to Part V agreements, 4. For all ancillary site works
The brief summarizes the pattern across all 389 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record LB201796The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief