Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 614 decisions within 5 km, 2 exact-site or onsite candidate records, and 42 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
42 structured nearby appeal records.
42 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development will consist of the following: 1. Construction of a new detached dwelling. 2. Construction of a new garage. 3. New entrance to site. 4. All associated site works. Significant further information/revised plans submitted on this application
Development will consist of the following: 1. Construction of a new detached dwelling. 2. Construction of a new garage. 3. Relocation of agricultural lane to existing farm. 4. New entrance to site off relocated agricultural lane. 5. All associated site works. Significant further information/revised plans submitted on this application
Alterations and reorientation of previously approved erection of photovoltaric panels on the roof of community centre adjacent to the church
Development consists of the erection of photovoltaic panels on the south roof of community centre adjacent to the church. St Mary's Church is a Protected Structure
3 no. adjoining agricultural sheds and all associated site works. Significant Further Information/revised plans submitted on this application
Demolition of existing conservatory and timber decking to the rear of the existing dwelling construction of a replacement single storey extension and ground level terrace to the rear of the existing dwelling, construction of a new garden store room at lower ground floor level to the rear of the existing dwelling and all associated site works
The brief summarizes the pattern across all 614 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record LB201853The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief