Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 758 decisions within 5 km, 2 exact-site or onsite candidate records, and 65 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
65 structured nearby appeal records.
65 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a new detached residential dwelling & detached garage, proprietary wastewater treatment system and percolation area, new site entrance from road to enter the site, landscaping and all ancillary site works
Development will consist of the construction of a new detached residential dwelling & detached garage, proprietary wastewater treatment system and percolation area, new site entrance from road to enter the site, landscaping and all ancillary site works. Significant Further information/ Revised plans submitted on this application
Construction at the existing farmyard of an underground slurry tank with dungstead over and all other associated site works.
Development will consist of the following: 1. Construction of a new single-story extension to west side/front of existing dwelling. 2. Construction of a new single-story extension to the east side of existing dwelling. 3. All associated site works
The development will consist of a facility for the recovery of waste concrete on a 1.8ha area at Annagor Quarry, as conducted previously at this site. The recovered materials will meet the Environmental Protection Agency End of Waste Criteria. A Waste Facility Permit will be sought for this activity.
The construction of a new part single-storey, part storey and a half dwelling, detached garage, wastewater treatment system, new site entrance, and all associated site works
The brief summarizes the pattern across all 758 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record LB201855The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief