Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
22% of nearby decided applications were refused. The site check found 548 decisions within 5 km, 1 exact-site or onsite candidate record, and 59 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
59 structured nearby appeal records.
59 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development will consist of construction of a storey & a half style dwelling with detached domestic garage, install a septic tank & percolation area and form new entrance from public road
A storey and a half dwelling with single storey rear annex, domestic garage, vehicular entrance waste water treatment system and all associated site works
The development will consist of a storey and a half dwelling with single storey rear annex, domestic garage, vehicular entrance, wastewater treatment system and all associated site works
A storey and a half dwelling with single storey rear annex, domestic garage, vehicular entrance, waste water treatment system and all associated site works
A storey and a half dwelling with single storey rear annex, domestic garage, vehicular entrance, waste water treatment system and all associated site works
The development consists of the retention of amendments made during the course of construction which include the reduction in length of central link and fenestration changes to house, rotation of garage and minor location modifications to site layout from that previously granted under AA/200559
The brief summarizes the pattern across all 548 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record LB202087The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief