Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 976 decisions within 5 km, 1 exact-site or onsite candidate record, and 78 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
78 structured nearby appeal records.
78 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To remove temporary accommodation blocks to rear of site, provide internal alterations to existing educational and administrative building, alterations to elevations and new entrance porch, additional carpark spaces to rear of site, new site access and entrance arrangement, landscaping and all associated site works
Installation of a 3m high 'lamp post' style relief vent stack servicing the existing below ground natural gas pressure reduction unit with all ancillary services and associated site works
A pedestrian/cycle bridge crossing the River Blackwater extending to c. 93.6 metres in length. The bridge will provide for a shared pedestrian and cycle access (4 metres wide) extending from permitted footpath and cycle infrastructure at Balmoral Industrial Estate at the southern part of the site, spanning the watercourse and connecting to existing pedestrian and cycle network in the Blackwater Public Park, on the northern side of the site. The proposal will include safety balustrades and lighting, all infrastructure, landscaping, access and associated site development works to enable the development. A Natura Impact Statement will be submitted to the planning authority with the application. Significant further information/revised plans submitted on this application
Construction of a single-story rear living room and bedroom extension
The extension and renovation of existing residence including new rear entrance and car parking. The proposed floor area of the extension is reduced from that previously granted Planning Permission under Register Reference No. 24/472.
The extension and renovation of existing residence including new rear entrance and car parking
The brief summarizes the pattern across all 976 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record NA181137The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief