Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 993 decisions within 5 km, 2 exact-site or onsite candidate records, and 79 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Meath County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
2 matchedOne current citation from the Meath County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Meath County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
79 structured nearby appeal records.
79 matchedCitations are current-dated and carry policy name, section, page and source URL from the Meath County Council development plan.
1 matchedOpen preview
Open preview
Permission to replace existing 12.4m high telecoms structure with a 21m high lattice communication structure, carrying communication dishes and antennae within an existing 2.4 metre high fenced compound
Existing 3 no. 1.3m high antennae, 1 no. 0.3m dish on existing 21 metre high lighting structure, equipment cabinet and associated equipment within a fenced compound. The development forms part of Vodafone Ireland Ltd's existing GSM and 3G Broadband telecommunications network.
Partial demolition of existing building, retention of existing roof and alterations and extension to existing forecourt sales building to include additional deli, public seating area, public toilets, off-license, relocation of store, relocation of ATM and offices. To reposition existing carwash and reconfiguration of existing carparking including location of air/water services, vent pipes and compound. Significant further information/revised plans submitted on this application
Permission for alterations to development permitted under planning reference NA/180879 to include 1. Alterations to forecourt sales building to include a reduced extension footprint comprising of retail with ancillary off-licence, deli area, public seating area with ancillary stores, toilets, ATM and office 2. Omission of repositioned existing car wash and associated works and 3. Construction of new fuel delivery off-loading area at Riverside Service Station, Dublin Road, Limekilnhill, Navan, Co Meath C15 TCK3
The development will consist of: (A)- The Construction of a split-level building with part single-storey and part three-storey school for Árd Rí Community National School comprising of teaching spaces, ancillary spaces, physical education hall facility, special education needs unit, general purpose hall, social areas, library, administration areas, toilet and changing facilities, external stores, and associated ancillary accommodation with a total internal area of circa 3,591.00m². (B)- The Construction of a two-storey building for St. Ultan’s Special School comprising of teaching spaces, ancillary spaces, physical education hall facility, special education needs suite, general purpose hall, social areas, library, administration areas, toilet and changing facilities, external stores, and associated ancillary accommodation with a total internal area of circa 4,359.20m², Additionally, the development will include all associated site works such as car parking, bicycle parking, shared sports facilities, playing areas, open spaces/landscaping, plant, bin stores, site services, and connections to facilitate the development. There will also be vehicular and pedestrian access to the development via Baker Hall along with additional pedestrian access points to the north and west. Significant further information/revised plans submitted on this application
Permission for revised opening hours until 6pm, for the part of the existing creche facility at former Apt 123 at
The brief summarizes the pattern across all 993 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record NA190020The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief