Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 813 decisions within 5 km, 8 exact-site or onsite candidate records, and 49 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
49 structured nearby appeal records.
49 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Alterations to existing offices and construction of a mezzanine floor of approx. 47 sq.m. within an existing industrail unit
1) the provision of underground bunded tank and internal storage vessel with a volume of 100m3. 2) Construction of a bunded unloading area with overhead canopy. 3) Single storey extension of 129.3m2 to existing bulk storage room. 4) Partial demolition and single storey extension of 66.4m2 to existing dust room and all associated site works. Significant further information/revised plans submitted on this application
1) An extension to existing warehouse with an area of 1785m2, 2) A two storey prefabricated Canteen building with an area of 120m2, 3) Covered yard area for material storage, 4) Relocation of HGV parking area with additional hardstanding and all associated earthworks and site works
Construction of, 1) 1125m2 Building for the production and storage of standard & sustainable raw material for use in our existing PIR manufacturing process 2) 240m3 Solid Storage silo with hardstanding base, 3) Relocation and upgrade of existing sewage treatment system, 4) Relocation and upgrade of existing Gas storage tank, 5) Installation of a rainwater harvesting system, 6) Earthworks and all associated site works at Liscartan, Navan, Co. Meath. This application requires an Industrial Emissions Licence Review Application and is accompanied by a Natura Impact Statement (NIS) and an Environmental Impact Assessment Report (EIAR).
The development will consist of a 50 P.E BAF WwTP, Pump chamber & Percolation upgrade and all associated site works as per design by Mitchell Envirironmetal in accordance with EPA Code of Practice 2009 for Waste-water Treatment and Disposal and as part of an EPA IPPC Licence review Ref: P0583-01
The erection of 1 no. free standing, 1.5m wide X 4m high X 0.4m deep, double sided internally illuminated totem sign located at the vehicular entrance. 1 no illuminated, wall mounted sign, 8m wide x 1.5m high on existing building and 3no. post and panel signs 1m wide x 0.6m high in carpark area and all associated site works
The brief summarizes the pattern across all 813 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record NA190063The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief