Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 1,005 decisions within 5 km, 3 exact-site or onsite candidate records, and 79 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
79 structured nearby appeal records.
79 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The change of use of Unit 7 from office to use as a Credit Union, new external signage and all assocaited site works to complete the development
Construction of a four storey Meath Digital Innovation Hub Office Building. The development also includes the provision of additional carparking spaces and to connect to access road leading to public road with carparking granted under previous planning Ref. No. NA190736. To provide Electrical Substation and switch room, covered bicycle spaces, bin storage enclosure, site lighting and to connect to existing Council Mains, Sewage and Storm Sewers with associated site works. Significant further information/revised plans submitted on this application
Part change of use of existing Enterprise building from use as offices and light industrial units to use as Food Processing Incubator Units. Permission is also sought for revised entrance arrangement from public road, to construct new entrance piers and walls with railings and to provide additional carparking with associated site works
The development will consist of 1. The modification and extension of the existing ground floor extension previously granted under NT120043, to accommodate a modified Kitchen and dining Area, TV room, Library, Music Room, Open Seating Area and Sunroom, 2. The construction of 16 additional nursing bedroom units and associated day room, dining room and nurses' station and stairs at first floor, with associated internal changes and ancillary facilities. 3. The connection to existing services including all ancillary site works. 4. 10 No. additional car parking spaces. 5. The protected structure of the existing nursing home is not affected by the proposed amendments. Significant further information/revised plans submitted on this application
Demolition of the existing side garage and utility which is attached to the existing two storey semi-detached dwelling, the sub-division of existing residential site, the construction of a two storey style detached dwelling with a linked ground floor family flat, 2no. site entrances, new western boundary wall with pedestrian side access gate, revisions to the site layout plan, connection to all public services and all associated site works
Development to be retained consists of change of use of attached domestic garage to habitable use including minor alterations and retention of existing single storey extension to the rear of existing garage and dwelling and all associated site works
The brief summarizes the pattern across all 1,005 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record NA190083The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief