Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 1,001 decisions within 5 km, 1 exact-site or onsite candidate record, and 77 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
77 structured nearby appeal records.
77 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
1. Construction of a new single storey side and rear tiled roof extension to consist of a playroom, kitchen and utility. All finishes to match existing dwelling. 2. General remodel and upgrade of the ground floor to suit the proposed layouts. 3. All drainage, structural and associated site works to be implemented
A ground floor extension to the side and rear of the existing dwelling & all associated site works
The development will consist/consists of (i) The construction of a new two storey extension consisting of a new 4 no. Classbase Special Educational Needs facility and ancillary accommodation, 7 no. General Classrooms, General Offices and 1 no. Home Economics Room. Building to be linked to the existing post primary school. (Total Area = 1953m2), (ii) The construction of a new standalone Technical Hub building to include a Technology Room, Construction Studies Room, Engineering Room, (Total Area = 568m2). (iii) The demolition of existing external store to accommodate new technical hub building.(Total Area = 31m2). (iv) The installation of 42.5m2 of south facing photovoltaic panels to the 2 storey extension and 29.5m2 to the technical hub building. (v) A new access road to new and relocated carparking spaces (102 No.) and new bicycle spaces (100 No.) (vi) A Natura Impact Statement will be submitted to the planning authority with the application
Part change of use of existing Enterprise building from use as offices and light industrial units to use as Food Processing Incubator Units. Permission is also sought for revised entrance arrangement from public road, to construct new entrance piers and walls with railings and to provide additional carparking with associated site works
The change of use of Unit 7 from office to use as a Credit Union, new external signage and all assocaited site works to complete the development
Construction of a four storey Meath Digital Innovation Hub Office Building. The development also includes the provision of additional carparking spaces and to connect to access road leading to public road with carparking granted under previous planning Ref. No. NA190736. To provide Electrical Substation and switch room, covered bicycle spaces, bin storage enclosure, site lighting and to connect to existing Council Mains, Sewage and Storm Sewers with associated site works. Significant further information/revised plans submitted on this application
The brief summarizes the pattern across all 1,001 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record NA191247The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief