Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 922 decisions within 5 km, 1 exact-site or onsite candidate record, and 67 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
67 structured nearby appeal records.
67 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A two storey dwelling house, detached garage, new wastewater treatment system and percolation area and all associated site development works. Significant further information/revised plans submitted on this application
To construct proposed private residence, install proposed wastewater treatment system and percolation area, proposed domestic garage, install new entrance onto main road, including all ancillary site works
A ten-year planning permission for a solar energy development with a total site area of approximately 34 hectares comprising (i) photovoltaic solar panels on steel mounting frames; (ii) electrical inverters; (iii) electrical power stations; (iv) an electrical control building and associated electrical apparatus; (v) underground electrical and communications cabling; (vi) on-site access tracks; (vii) a temporary construction compound; (viii) security fencing and security gates; (ix) pole-mounted security cameras; and (x) all associated and ancillary site development, landscaping and reinstatement works. The operational lifetime of the proposed development is 35-years. This development is related to an activity requiring an Industrial Emissions Licence. This planning application is accompanied by an Environmental Impact Assessment Screening Report and a Natura Impact Statement
Alterations to the existing Mercedes showroom building, including modifications to the existing entrances, modification to existing glazing, installation of steel posts and installation of new signage and associated works
(i) Construction of a single storey extension to side and rear of existing building, (ii) Erection of an entrance canopy, and (iii) All associated site and development works. Significant further information/revised plans submitted on this application
Full planning permission is sought for: 1) Demolition of 11 No. dwellings and domestic garages/ outbuildings (10 No. semi-detached dwellings & 1 No. detached dwelling), and 2) Decommissioning & removal of 5 No. existing waste water treatment systems and associated soakpits. Outline planning permission is sought for: 1) 11 No. detached replacement dwellings, 2) Revised site boundaries, 3) Revised entrance details, 4) Revised agricultural entrance locations, 5) 11 No. new waste water treatment systems and percolation areas, and 6) all ancillary site development works. Significant Further Information/revised plans submitted on this application
The brief summarizes the pattern across all 922 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record NA200285The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief