Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 986 decisions within 5 km, 2 exact-site or onsite candidate records, and 77 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
77 structured nearby appeal records.
77 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a front porch along with any ancillary site works
The change of use of former Lighthouse Church to Cross Fit Gymnasium and Physiotherapy room. Operational hours Monday to Friday: 6am to 10am, 4pm to 5pm, 6.25pm to 8.30pm. Saturday: 9am to 10.15am. Sunday: 9am to 10.15am.
The construction of a spa, sauna, coffee room, changing rooms and office adjoining existing Gymnasium
Retention planning permission for commercial office and solid fuel store & signage
1. Existing single storey hipped roof to side removed, two storey pitched roof tying in with existing to be added, adding 32m2 to first floor and 24m2 to second floor. 2. Associated internal modifications and site works
The construction of a first floor extension with all associated site works
The brief summarizes the pattern across all 986 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record NA200852The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief