12% of nearby decided applications were refused. The site check found 490 decisions within 5 km, 1 exact-site or onsite candidate record, and 41 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
41 structured nearby appeal records.
41 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The provision of a new two storey dwelling house accessed off existing laneway, a new wastewater treatment system and all associated site development works
Permission to construct a part storey and a half, part single storey, split level dwelling house, detached garage, new wastewater treatment system and percolation area and all associated site development works. Significant further information/revised plans submitted on this application
The construction of a one and a half storey dwelling house, a domestic garage, an approved waste water treatment system and percolation area to EPA standard, provision of a water well, construction of an entrance to the public road, together with all other works ancillary to the overall development. The application is for a change of house type on the planning reference NA/900285 and an extension of duration of the said planning permission reference KA/140645
Construction of a two storey style dwelling with detached domestic garage, install a Proprietary Sewage Treatment System and form new entrance to public road
The construction of a new single storey extension to existing dwelling house, new bedroom window to side (North West) elevation, provision of a new wastewater treatment system and polishing filter and associated site works
The development will consist of permission to amend the design of the approved development (planning reference: LB171475) for an energy storage facility to provide services to the national grid system on the 2.8ha site, Comprising battery containers, combined power conversion system and transformer units, associated electrical infrastructure, fencing, access track, CCTV, ecologically beneficial landscaping, and associated ancillary development on lands in Causestown, Stackallen, Navan, Co. Meath., subject to 17 conditions. Amendments proposed are: - Two phases of development, proposed with the combined capacity of no more than 100MW. - Increase the life of the permission from 5 to 10 years to facilities phase 2. - Amend condition 11 of parent consent (Planning Ref: LB171475) to specify that any remedial road works if required as a result of the development shall be focused on the L3411 from Entrance A to N51 junction. - Amend condition 12 of parent consent (Planning Ref: LB171475) To allow for construction works to be carried out between 0700 and 1900 Monday to Friday and 0800 and 1600 on Saturday. - Increase from 24 to 33 smaller battery containers. 31 of which are orientated in a northwest to southeast direction, with the other two in the southeast corner oriented in an east-northeast to west-southwest direction. - Change from 24 large combined Power Conversion System (PCS) and transformer units to 40 much smaller individual PCS and transformer units. These will no longer be housed in containers but are externally mounted. - Addition of four Low Voltage (LV) cabinets. - Revised layout and size of the grid connection and compliance equipment within the storage area: - Change from a 500m3 underground surface water storage tank to a surface water storage pond, with stock proof fence and gate; - Spare parts container moved from the east to the southwest corner of the ESF compound; - Additional small section of temporary access track and cable trench in west corner for grid related works; - Increase in length of the Modular substation within the ESF. - Removal of Grid transformer off site to be relocated within the associated Grid Connection infrastructure (subject to separate planning application). - Addition of 2No. CCTV Cameras (a total of 7No. CCTV Cameras within the site). - Addition of 5 Security Light Columns
The brief summarizes the pattern across all 490 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record NA201082The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.