Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 900 decisions within 5 km, 1 exact-site or onsite candidate record, and 49 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
49 structured nearby appeal records.
49 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The proposal involves the development of two ventilation shafts that will provide ventilation to an underground exploration tunnel and enable further exploration. The development works will consist of: Raise-bore drilling two vertical 4.5-meter diameter shafts (to be known as Return Air Raise (RAR) 6 and RAR 7) reamed from a depth below ground of c. 1,000 meters to surface. The proposed shafts will connect to an underground fan station that will draw air from the extant exploration tunnel and exhaust it to surface. At surface level, the development site will occupy an area of approximately 90 m x 120 m bounded by a 2.5 m high boundary fence, service and access roads and all ancillary site works. Each shaft will be fitted with a deflection hood (5.7 m x 5.7 m x 8.8 m) that will direct airflow horizontally into a 6.5 m earthen berm. An Environmental Report for the development will be submitted to the Planning Authority with the planning application. A Natura Impact Statement (NIS) for the development has been prepared and will be submitted to the Planning Authority with the planning application
EXTENSION OF DURATION NA201153 - the proposal involves the development of two ventilation shafts that will provide ventilation to an underground exploration tunnel and enable further exploration. The development works will consist of: Raise-bore drilling two vertical 4.5-meter diameter shafts (to be known as Return Air Raise (RAR) 6 and RAR 7) reamed from a depth below ground of c. 1,000 meters to surface. The proposed shafts will connect to an underground fan station that will draw air from the extant exploration tunnel and exhaust it to surface. At surface level, the development site will occupy an area of approximately 90 m x 120 m bounded by a 2.5 m high boundary fence, service and access roads and all ancillary site works. Each shaft will be fitted with a deflection hood (5.7 m x 5.7 m x 8.8 m) that will direct airflow horizontally into a 6.5 m earthen berm. An Environmental Report for the development will be submitted to the Planning Authority with the planning application. A Natura Impact Statement (NIS) for the development has been prepared and will be submitted to the Planning Authority with the planning application
To extend an underground exploration tunnel within Hanlonstown, Gainstown and Curraghtown Townlands, Navan, County Meath. The development will consist of extending the existing TRDEX underground exploration tunnel by approximately 3.0 kilometres through hard rock, from a depth of approximately 1,020 to 1,200 metres below ground level. The purpose of this extension is to facilitate exploration drilling and resource definition for the deposit known as Tara Deep. The proposed development will be carried out in three phases: Phase 1 will extend the existing exploration tunnel by approximately 450 m; Phase 2 will involve construction of a tunnel to the east, perpendicular to existing tunnel with a spiral decline of approximately 1,900 m; and Phase 3 will involve construction of a parallel tunnel to the west approximately 600 m. Ancillary bays and cubbies will also be developed as smaller tunnels to facilitate exploration drilling. No surface works, ore extraction or processing will be undertaken as part of this development. Access will be from the existing underground mine. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application. Significant Further Information/Revised Plans submitted on this application
Permission for retention of additional floor area to the rear, alterations to all elevation and minor internal changes from that previously granted under NA50219 and all associated site development works
Construction of a two storey style dwelling with detached domestic garage, install a proprietary sewage treatment system and form new entrance from public road
Permission to construct a single storey dwelling, domestic garage, entrance, and to construct a wastewater treatment system and site works
The brief summarizes the pattern across all 900 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record NA201153The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief