Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 1,003 decisions within 5 km, 3 exact-site or onsite candidate records, and 76 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
76 structured nearby appeal records.
76 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development will consist of a 10 bay portal frame warehouse shed to side and rear of existing shed, retaining walls to enclose a new ancillary yard area, associated storm water attenuation, oil interceptor, modifications to existing shed elevations together with all associated site works
The development consists of changes to development previous granted planning permission under planning reference no. RA/180547 which includes raising the eave and ridge height of the proposed 10 bay portal frame warehouse located to the rear of the existing shed together with modifications to elevations and all associated site works
Retention of alterations to existing detached domestic garage granted under DA130204. Also, for permission for change of use of said domestic garage to self-contained granny flat, to use existing site entrance and to connect to existing services servicing the main dwelling
Permission for retention of the following works; (a) Revision to the site boundaries for the existing dwelling and site to those previously granted in planning ref. no. RA201685, 991997 & 95429 and (b) Relocation and repositioning of the wastewater treatment system previously granted in planning ref. no. RA201685 and all associated site works
Remodelling and renovation to an existing 6 no. bedroom dormer bungalow consisting of internal modification of existing Ground floor of 251m2 with demolition of existing attic accommodation (87m2) in roof with new pitched roof first floor accomodation of 106m2 with dormer windows to front and side elevations and Velux windows to rear with new main feature entrance and 1st floor recessed balcony to create a 4 no. bedroom dormer bungalow overall with new external insulated plasterwork and selected natural stone finish to existing brickwork with new aluminium facia and rain water goods with new triple glazed windows and doors with new external decking, with new waste water treatment system, with landscaping and associated site works. Significant further information/revised plans submitted on this application
The provision of a temporary primary school by way of construction of 2 No. prefabricated buildings (c.282sqm and 181sqm) on a defined site area (c.0.27Ha) to be enclosed within a 2m high welded mesh fencing and access gates with associated site works including provision of hard surface play area. Temporary permission for a period no longer than 5 years is being sought
The brief summarizes the pattern across all 1,003 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record RA180547The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief