Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
17% of nearby decided applications were refused. The site check found 885 decisions within 5 km, 4 exact-site or onsite candidate records, and 69 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
69 structured nearby appeal records.
69 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development consists of revisions to that previously granted planning under register Ref. No: RA140680, being change of house type, and revised position of storey & a half house, detached domestic garage, proprietary effluent treatment system & percolation area, close up existing family entrance & open new double entrance to serve proposed dwelling and adjacent family home and all ancillary works
(1) demolition of existing detached shed and existing rear extension to existing cottage, (2) construction of a rear extension to existing cottage, (3) conversion of existing cottage to a family flat, (4) modified entrance driveway as per Reg. Ref. RA/180986, (5) a new detached double garage to the rear of the site, (6) replacement of existing septic tank with a new WWTS and percolation area
The construction of a storey and a half extension to the side of an existing house, a shed to the rear of the property and all associated works. Significant Further information/Revised plans submitted on this application
The construction of a storey and a half extension to the side of an existing house, a domestic garage to the rear of the property and all associated works. The retention of the children's activity play area and the upgrading of the sewerage system. Significant Further information/Revised plans submitted on this application.
The development will consist of (1) additions and alterations to the existing dwelling house to include construction of (a) a two-storey pitched roof extension to rear (b) a single-storey flat roof extension to rear (c) a first floor pitched roof extension to side and (d) a single-storey flat roof extension to front in place of the existing colonnade with increased depth of existing overhead first floor balcony and (2) all associated site, drainage and structural works
A 10 year planning permission for construction of a solar PV farm within a site area of 54.57 hectares and will consist of 31.5 MW solar farm comprising photovoltaic panels on ground mounted frames, 14 no. single storey MV substations, 1no. single storey DSO substation. 1 no. single storey customer substation. 1 no. single storey spares building, 1 no. communications pole, boundary security fencing, CCTV, associated electrical cabling and ducting, provision of access tracks, access gates and all associated ancillary development and landscaping works. Significant further information/revised plans submitted on this application
The brief summarizes the pattern across all 885 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record RA180986The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief