Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 935 decisions within 5 km, 2 exact-site or onsite candidate records, and 72 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
72 structured nearby appeal records.
72 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a private dwelling, new entrance, detached domestic garage, wastewater treatment system and all associated site works
Construction of a proposed private dwelling, detached domestic garage, wastewater treatment system, new entrance and all associated site works
The development will consist of the renovation and extension of an existing two-storey detached dwelling, the decommissioning of the existing wastewater treatment system and installation of a new proprietary wastewater treatment system and polishing filter and all ancillary site works. Significant further information/revised plans submitted on this application
The development will consist of permission for a Solar PV Energy Development with a total site area of 82.5ha, to include solar panels mounted on steel support structures, associated cabling and ducting, 21 No. MV Power Stations, 7No. Battery Storage Containers, 1 No. Temporary Construction Compound, access tracks, hardstanding area, boundary security fencing and security gates, CCTV, landscaping and ancillary works
Retention of single-storey extensions and alterations to the existing house, retention of domestic garage to the rear of the house and all associated siteworks
The development will consist of (1) construction of a single storey rear extension and a (2) single storey side front extension. (3) A new pitched roof covering the new extensions and the existing flat roof section of the building aligning with the existing pitched roof on the building. (4) partial demolition of an existing shed to the rear of the current property
The brief summarizes the pattern across all 935 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record RA190239The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief