Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 1,829 decisions within 5 km, 3 exact-site or onsite candidate records, and 226 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Meath County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Meath County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Meath County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
226 structured nearby appeal records.
226 matchedCitations are current-dated and carry policy name, section, page and source URL from the Meath County Council development plan.
1 matchedOpen preview
Open preview
1. The retention of development will consist of revised site layout and revised site boundary and completion of partially constructed dwelling as per previously approved planning permission Ref no. RA/180922. 2. Permission for development will consist of construction of new garage. 3. All associated site works
1. Construction of a new detached 2-storey dwelling 2. Construction of a new garage & carport. 3. New proprietary wastewater treatment system & percolation area 4. New entrance to site, adjoining existing entrance to family home 5. All associated site works
The following: 1. Construction of a new detached, 2-storey dwelling 2. Construction of a new garage 3. New proprietary wastewater treatment system & percolation area 4. New entrance to site 5. All associated site works.
Retention of 4 no. steel containers on site for the purpose of the secure storage of agricultural machinery and ancillary items and all associated site development works
Planning permission for retention of development and permission as per previously granted permission Ref: No. RA/171526. The development will consist of the following: 1. Retention of omission of proposed carport as per previously granted permission. 2. Permission to amend Planning Condition 2 (a) under Section 47 of the Planning and Development Act 2000-2017 of previously granted permission
The development for retention consists of alterations to previously granted dwelling extension and external finishes and for as constructed detached domestic garage ancillary to the dwelling. The proposed development will consist of a new proprietary wastewater treatment system and percolation area and all associated and ancillary site works
The brief summarizes the pattern across all 1,829 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record RA190844The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief