Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 338 decisions within 5 km, 5 exact-site or onsite candidate records, and 16 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
16 structured nearby appeal records.
16 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction no. 4 single storey agri tourism accommodation dwellings. New proposed entrance to site. Connecting to existing mains sewage and water scheme and all associated development works
The change of use of existing no. 6 three bedroom single storey agri tourism accommodation dwellings to residential dwellings. Use the entrance to the site previously granted. (Planning Ref. RA201113). Connecting to existing mains sewage and water scheme and all associated development works. Revoke planning permission conditions Ref. RA201113 / 21900
The construction 2no. single storey three bedroom agri tourism accommodation dwellings. Use the entrance to the site previously granted. (Planning Ref. RA201113) Connecting to existing mains sewage and water scheme and all associated development works. Significant Further information/Revised plans submitted on this application
Development will consist of the construction 4no. two storey semi detached, 3 bedroom agri tourism accommodation dwellings and 1 no. two storey detached, 3 bedroom agri tourism accommodation dwelling. Use the entrance to the site previously granted. (Planning Ref RA201113) Connecting to existing mains sewage and water scheme and all associated development works.
Construction of 3 dormer type bungalows, each with a domestic garage, and own entrance, access through site by means of existing access, Connecting to existing mains sewage and mains water and associated site works. Significant further information/revised plans submitted on this application
The development will consist of: three single storey, three bedroom agri tourism accommodation dwellings, using existing shared entrance, connecting to existing ains sewage and water scheme and all associated site works
The brief summarizes the pattern across all 338 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record RA201113The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief