Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 708 decisions within 5 km, 1 exact-site or onsite candidate record, and 50 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
50 structured nearby appeal records.
50 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a storey and a half type dwelling, domestic garage, effluent treatment system and associated site works
A) Demolition of existing agricultural shed. B) Construction of an access passageway. C) Construction of cattle shed to include slatted tanks and handling area. D) Construction of dungsted. E) Construction of a suckler cow shed to include stalled tank, straw lie back area and calving area. F) Construction of Agricultural shed to include meal and straw store. G) Installation of Solar Panels onto proposed sucker cow shed. H) Construction of Rainwater Harvesting tank. I) Construction of Silage Pit and all associated site works. Significant further information/revised plans submitted on this application
The construction of a single storey extension to the side of the existing dwelling, to consist of a new bedroom and family room, along with the construction of a single storey domestic garage and all associated ancillary site works. Significant Further information/Revised plans submitted on this application
A single story steel framed building containing Horse Stabling with services, Dry Fodder Storage, Detached Covered Dungstead, Concrete Aprons and all other site works
The development will consist of a new two-storey dwelling with single storey living area to the west, associated detached double garage, opening of a new vehicular entrance to site and wastewater treatment system and percolation area together with all associated site development works
Partial Demolition / Rebuild / Refurbishment and Extensions to an existing fire damaged 3 bedroom 2 storey dwelling house, including the following: Rebuilding of existing house utilising existing building footprint with window head and cill levels, eaves and ridge levels, all to match existing. A new 2 storey extension on the north east corner of the existing house comprising new entrance hall and wc at ground floor level, and relocated bathroom and new master en-suite at first floor level. A new 2 storey extension on the south east corner of the existing house comprising, relocated rear porch and utility room at ground floor level and a new fourth bedroom at first floor level. A New replacement roof, incorporating 2 no. dormer windows and 3 no. velux roof lights to the north east elevation and 2 no. dormer windows to the south west elevation, water harvesting system. New waste water treatment plant, and associated site development and drainage works
The brief summarizes the pattern across all 708 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record RA201317The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief