Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 466 decisions within 5 km, 2 exact-site or onsite candidate records, and 15 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
15 structured nearby appeal records.
15 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development consists of land recovery operation (being) reclamation of agricultural land and all associated site works comprising of the importation of natural materials of clay, silt, sand, gravel or stone and which comes within the meaning of inert waste, through deposition for the purposes of the improvement or development of land Class 5 of the Waste Management (Facility Permit and Registration), regulations 2007-2008. A 5 year planning permission is requested and during the duration of this period 99,898 tonnes of inert soil and stone will be imported for the purpose of land reclamation. Entrance to the site will be via the existing farm road on adjoining site the subject of current planning RA/170057 and WFP-MH17/0006/01. The above application relates to a development for the purpose of an activity requiring a waste licence
The development consists of land recovery operation (being) reclamation of agricultural land and all associated site works comprising of the importation of natural materials of clay, silt, sand, gravel or stone and which comes within the meaning of inert waste, through deposition for the purposes of the improvement or development of land Class 5 of the waste management (Facility Permit and Registration) Regulations 2007-2008. A 5 year planning permission is requested and during the duration of this period 62,490 tons of inert soil and stone will be imported for the purpose of land reclamation. Entrance to the site will be via the existing farm road on adjoining site the subject of current Planning RA/170057 and WFP-MH17/0006/01
The development will consist of the importation and insertion of 197,468 tonnes of inert soil and stone as a non-waste by product over a ten-year period, not exceeding 25,000 tonnes/annum, to improve 5.33 hectares of agricultural lands where. •The further use of the soil and stone is certain and will be used to recontour and improve the agricultural lands. •The soil and stone can be used directly without further processing. •The soil and stone will be an integral part of a production process i.e. soil will be excavated, moved to facilitate site development in accordance with Article 27 by a material producer or with the expressed written consent of a material producer and will be notifiable to the EPA as a by - product prior to its use on lands. •The proposed further use of the soil and stone fulfils all relevant product, environmental and health protection requirements for the specific use and will not lead to overall adverse environmental or human health impacts. On site equipment includes: •Existing Onsite wheel wash; •Existing Site Office, Welfare Facilities & Weighbridge; •Existing Hardstanding, Inspection and Quarantine Area. There is no planned removal of hedge line vegetation on the perimeter of the site
The developoment will consist of 1) single storey, pitched roof extension (57.8m2), including 2 no. Velux type rooflights, to side of existing house; 2) single storey, flat roof extension (11.5m2) rooflight to rear of existing house; 3) 1 no. new Velux type rooflight to front, and all associted site works
The retention of the following:- extension to dwelling, conversion of attic to storage area, domestic garage, changes made to dwelling durning construction, site boundaries and site layout to that granted under planning ref. no. 74/176
The development will consist of two-story extension of “story and a half” dormer design, measuring 130m², located to the rear. Comprising 2x new bedrooms, 2x new bathrooms, utility room, storage room and circulation space, and measures to improve accessibility at ground floor level, and work from home office and toilet room at first floor level. New windows to rear at ground floor level facing north- east, north- west, south-east and south-west. New windows at first floor level to north-east and south-east, and new roof windows on north-west side of extension roof. The development will include replacement and increasing capacity of the existing septic tank system using Sepcon BAF PE8 Tank with 105m2 polishing filter
The brief summarizes the pattern across all 466 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record RA202101The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief