Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
16% of nearby decided applications were refused. The site check found 384 decisions within 5 km, 1 exact-site or onsite candidate record, and 20 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
20 structured nearby appeal records.
20 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a two storey dwelling, a detached domestic garage, a wastewater disposal system, a detached stable building with ancillary rooms, upgrade of existing agricultural site entrance to a shared domestic and agricultural site entrance and all associated site works. Significant further information/revised plans submitted on this application
The development will consist of the construction of a dwelling, new entrance, waste water treatment system and percolation area and all associated site works. Significant further information/revised plans submitted on this application
The construction of a two storey dwelling, a detached domestic garage, stables, a dungsted, the installation of a wastewater disposal system, new site entrance along with all associated site works
For a Solar PV Energy Development with a total site area of 108.68ha, to include solar panels mounted on steel support structures, associated cabling and ducting, 27 no. MV Power Stations, 3 No. Client Substations, 3 No. temporary construction compounds, access tracks, boundary security fencing and security gates, CCTV, landscaping and ancillary works. Significant Further information/Revised plans submitted on this application
The construction of a single storey dwelling, a detached domestic garage, the installation of a wastewater disposal system, new site entrance along with all associated site works
The construction of a single storey dwelling, a detached domestic garage, the installation of a wastewater disposal system, new site entrance along with all associated site works
The brief summarizes the pattern across all 384 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record TA191209The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief