Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 262 decisions within 5 km, 1 exact-site or onsite candidate record, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of dwelling, waste water treatment system and percolation area and all associated services
The development will consist of the following: 1. Demolition of existing dwelling and storage shed. 2. Construction of new detached replacement dwelling. 3. The installation of a new proprietary wastewater treatment system and percolation area. 4. Landscaping, and all ancillary site works
Planning permission to construct a two-storey dwelling house, domestic garage, upgrade existing entrance off Cul De Sac and install a sewage treatment system with percolation area together with all works ancillary to the overall development on site
The development will consist of the construction of single storey family unit extension to existing dwelling and all associated site works
The development will consist of retention permission of: 1. Pitched roof over garage, 2. Storage shed to rear of garage, 3. Garden room to rear of site
The development consists of the conversion of the attic space to two bedrooms plus one bathroom.
The brief summarizes the pattern across all 262 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record TA200981The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief