Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
16% of nearby decided applications were refused. The site check found 272 decisions within 5 km, 1 exact-site or onsite candidate record, and 11 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
11 structured nearby appeal records.
11 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development will consist of an application to construct a dwelling house, a domestic garage, an entrance from an existing lane, leading to the public road, a waste water treatment system and percolation area to the EPA recommendation, provision of a water well, together with all works ancillary to the overall development
An application to construct a bungalow dwelling house, a domestic garage, an entrance from an existing lane, leading to the public road, a waste water treatment system and percolation area to the EPA recommendation 2021, provision of a water well, together with all works ancillary to the overall development. Significant further information/revised plans submitted on this application
The development will consist of: New Agricultural Machinery storage shed & all associated site works
The development will consist of the demolition of an existing shed, construction of a detached agricultural shed, construction of a dungstead, upgrade works to an existing vehicle entrance to serve this development and all associated site works and services
Construction of an extension to existing livestock sheds consisting of cubicles, feeding area & underground slatted slurry storage tank and all associated siteworks
Permission for continued use of the previously permitted developments under planning refs. TA180039; TA160094; TA150309; TA70175 (PL17.227088); TA30258 (PL17.206229); 00/2156 (PL17.125619) and 98/1981 (PL17.111632) including extraction and processing on site, to include washing (with associated closed system silt settlement lagoons), screening and crushing; storage; stockpiling; related ancillary buildings and facilities including the concrete batching and block making facilities; Permission for a lateral extension to the existing permitted quarry extraction under planning ref. TA70175 (PL17. 227088) to give an overall extraction footprint of c. 19.2 hectares; Extraction of rock within the proposed extension area will be to the same depth as the current permitted quarry floor level of c.24m AOD under planning ref. TA70175 (PL17.227088); Realignment of the existing internal access road over a distance of c. 400m to release rock reserves beneath for extraction, with relocation of the existing weighbridge and office; Permission for an overburden storage area along the eastern site boundary covering an area of c.0.8 hectares; Permission for a construction and demolition waste recovery facility which provides for the importation, storage, processing and recovery of waste concrete arising from concrete plants operated by Kilsaran on a c.3.9 hectare site within the existing quarry and provision for a hardstanding area for stockpiling and crushing of waste materials and a waste inspection/quarantine shed; Restoration of the site to a combination of beneficial ecological and agriultural after-use; All associated site works within an overall application area of c.50.2 hectares and all for a period of 10 years plus 2 years to complete restoration works (total duration of 12 years). An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of this planning application. Significant further information/revised plans submitted on this application
The brief summarizes the pattern across all 272 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record TA201991The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief