Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 463 decisions within 5 km, 5 exact-site or onsite candidate records, and 23 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched1 of 2 layers are loaded for Offaly County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Offaly County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Offaly County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
23 structured nearby appeal records.
23 matchedNo current-dated citation is loaded for Offaly County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
A SOLAR FARM COMPRISING SOLAR PHOTOVOLTAIC (PV) PANELS LAID OUT IN ARRAYS ON GROUND MOUNTED FRAMES ON A SITE OF APPROXIMATELY 12.63 HECTARES (HA). THE PROPOSED SOLAR PV FARM KNOWN AS PORTARLINGTON SOLAR PV FARM WILL INCLUDE 4 NO. SINGLE STOREY INVERTER UNITS, 1 NO. SINGLE STOREY ESB TERMINAL SUBSTATION, CUSTOMER SUBSTATION, 2 NO. STEEL STORAGE CONTAINERS, SECURITY FENCING, 10 NO. CCTV, AND ALL ASSOCIATED ANCILLARY DEVELOPMENT WORKS INCLUDING BENEFICIAL LANDSCAPE PLANTING, TEMPORARY INTERNAL CONSTRUCTION ACCESS TRACK TO THE ON-SITE ESB TERMINAL SUBSTATION AND PERMEABLE INTERNAL ACCESS TRACKS. VEHICULAR ACCESS TO THE DEVELOPMENT SITE WILL REMAIN VIA THE EXISTING ENTRANCE OFF THE R420. ESB OPERATIONAL ACCCESS TO THE ON-SITE TERMINAL SUBSTATION WILL BE PROVIDED VIA THE EXISTING SITE ENTRANCE OFF THE KILMALOGUE DOWNS
AMENDING THE EXISTING GRANTED APPLICATION (PLANNING REFERENCE PL2/17/275) AT THIS SITE. THE AMENDMENT APPLICATION WILL CONSIST OF PERMISSION TO AMEND THE DESIGN OF THE APPROVED DEVELOPMENT (PLANNING REFERENCE PL2/17/275) WHICH COMPRISES CONSENT FOR A SOLAR PV ENERGY DEVELOPMENT. PROPOSED AMENDMENTS INCLUDE; (1) THE CUSTOMER SUBSTATION AND ESB TERMINAL WILL MERGE INTO ONE BUILDING, AND (2) PROJECT LIFETIME PROPOSED TO BE EXTENDED FROM 5 TO 10 YEARS WITH AN INCREASED OPERATIONAL LIFE FROM 35 TO 40 YEARS
A NEW SLATTED AGRICULTURAL BUILDING, CONCRETE YARD, CATTLE CRUSH AND ALL ASSOCIATED SITE WORKS
AN AGRICULTURAL STRUCTURE TO INCLUDE A NEW SILAGE PIT (TO REPLACE EXISTING SILAGE PIT), DUNGSTED, AND ALL ASSOCIATED SITE WORKS
PROPOSED REAR EXTENSION TO THE EXISTING DERELICT COTTAGE, NEW DOMESTIC GARAGE, PROPOSED SEPTIC TANK WITH SECONDARY EFFULENT TRATEMENT SYSTEM, PERCOLATION SYSTEM AND ALL ASSOCIATED SITE WORKS
A SINGLE STOREY EXTENSION TO THE REAR OF THE EXISTING DWELLING, A DOMESTIC GARAGE/SHED AND ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 463 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 17275The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief