Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 2,411 decisions within 5 km, 3 exact-site or onsite candidate records, and 265 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
265 structured nearby appeal records.
265 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for development which will consist of an extension and minor alterations to the existing Galway - Mayo Institute of Technology IHub Building. Alterations to the existing IHub building will consist of elevational amendments to the south elevation, internal modifications of the existing boardroom, reception area and staff room. The proposed extension will comprise a three storey industrial support building with a total internal floor area of 1318 sq.m providing various sized office and work spaces, meeting rooms, multipurpose space, internal break out spaces, coffee dock, ancillary facilities, solar panels at roof level, amendments to existing car parking and landscaping, provision of new car parking, drainage, attenuation, landscaping, external lighting and all associated site works
Permission for development which will consist of a new 686sq meter, two-storey modular building, containing replacement classrooms and ancillary offices and all associated site works at the rear of the site adjacent to the existing gym building.
Permission for development which consists of; planning permission is sought by the Atlantic Technological University for development on a site extending to 0.7354 hectares located on the Dublin Road (R338) at the Atlantic Technological University Galway Campus, Murrough, Dublin Road, Galway. The proposed development will consist of the following: 1. The construction of a 2-storey multi-functional sports building extending to approximately 2866 sqm including a multi-purpose sports hall, changing rooms, a gym, multi-purpose room, meeting room, seating area and coffee dock. 2. The provision of a temporary pedestrian crossing on the Dublin Road (R338). 3. The provision of bicycle parking, car parking, ESB substation, site landscaping, signage and all associated site works and ancillary services necessary to facilitate the proposed development.
E.O.D on 12/202: Permission for development. The development will consist of a 2-storey multi-functional sports building, car parking, ESB Substation, signage, landscaping and all associated site development works and services. Vehicular access to the development will be via the existing access road off Ballyloughane Road. The proposed development also includes new and improved pedestrian and bus stop facilities on Dublin Road, to include bus set down, bus shelters and pedestrian crossing.
Permission for development which will consist of works to an existing lecture theatre converting it into two engineering laboratories, an engineering workshop and a general science laboratory. The project area of 522 sq metres includes works to the existing façade, provision of new windows, architectural cladding, mechanical flues, AHUs, PV panels and all ancillary site works
Permission for development which will consist of the construction of a new pedestrian entrance canopy/shelter at the main door of the existing hotel and all ancillary siteworks and services
The brief summarizes the pattern across all 2,411 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 17366The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief