Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 240 decisions within 5 km, 1 exact-site or onsite candidate record, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For development of a whiskey maturation warehouse facility on a site of 5.36 ha. The proposed facility is comprised of two buildings: (A) a warehouse of 2,727 sqm gross floor area and 8.68m tall, containing office space (183sqm), a hand bottling facility and storage space, and (B) a whiskey maturation warehouse of 2,996sqm gross floor area and 9.74m tall. The proposed development also includes modifications to an existing site entrance off Institute Road; an internal access road; parking for 10 no. cars, and loading bay for heavy goods vehicles; a surface water attenuation pond; an on-site wastewater treatment system and polishing filter; earthworks; landscaping; perimeter fencing and gates; CCTV cameras and all ancillary site works. Significant further information and revised plans have been submitted
For development consisting of the installation of 900m2 of PV solar panels array to the existing roof areas on the south side of existing factory roofs and all ancillary site works
For development consisting of (1) Demolish existing toilet area and out door diesel tank and bund wall to the rear of existing office, (2) New single storey extension to front and rear of existing offices, (3) Existing front door of office to be removed and replaced with new window, (4) Alteration to internal floor plan layout of existing offices, (5) Existing septic tank to be upgraded to a waste water treatment unit and all associated site works
To install effluent treatment system & associated works, and RETENTION permission for domestic storage shed & change of use of dwelling attic space to domestic accommodation
To retain and complete works at this site. The development consists of (a) retention permission for an existing domestic storage shed (generally of steel and block construction), (b) completion of the works by reducing the overall ridge height with alterations to elevations and (c) all ancillary site works
To retain an existing domestic storage shed (generally of steel and block construction) and all ancillary site works
The brief summarizes the pattern across all 240 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 17508The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief