Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 191 decisions within 5 km, 2 exact-site or onsite candidate records, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the erection of a dwellinghouse, with treatment system and soil polishing filter and all associated site works at
For the ‘Continuance of Use’ of the existing Rahora Windfarm, permitted under An Bord Pleanála Ref. PL10.206373 and Kilkenny County Council Ref. 03/1117; amended under 07/2253 (repositioning of the 5 no. turbines and amended layout for the site roads); further amended under 08/595 (repositioning of turbine number T5, amended layout to the site roads and reduction in size of the control building). The windfarm was built in 2008/2009 and commissioned on 6th May 2009. The operating windfarm consists of five (5) wind turbines, an electrical control building and associated hardstanding areas and access roads. The grant of planning was to operate the windfarm for a period of twenty years from the date of commissioning. This application is to operate Rahora Windfarm for a further period.
To retain indefinitely as built and PERMISSION to complete farm building comprising calf area, silage bales area, machinery area and all associated works
To construct an agricultural shed with straw bed, slatted tank & all associated site works
For external/internal alterations to an existing fully serviced dwelling and a constructed fully serviced extension to the side of the original dwelling with a new wastewater treatment system and associated works
For the construction of a fully serviced dwelling, an agricultural storage shed and associated works situated
The brief summarizes the pattern across all 191 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1818The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief