Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
1% of nearby decided applications were refused. The site check found 162 decisions within 5 km, 1 exact-site or onsite candidate record, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Leitrim County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Leitrim County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Leitrim County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedNo current-dated citation is loaded for Leitrim County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Construct 3 Bay Slatted Livestock Unit with concrete aprons including all ancillary works necessary to complete the development
Erect fully serviced single storey entrance porch to side of existing visitors centre and all ancillary site works
Planning Permission sought for: new childcare facility, to incorporate within the facility: (A) (i) formal entrance, (ii) reception and hallway, (iii) woddler/toddler room, with 2 no. attached toilets, 1 no. sleep room, baby changing area, milk kitchen room, (iv) classroom for children aged approximately 3 to 6 years of age, with 2 no. attached toilets, (v) breakfast room/after-school room (for children aged approximately 5+ years), with 3 no. attached toilets, (vi) kitchen, (vii) utility room, (viii) canteen, (ix) buggy store room, (x) plant room/toy store, (xi) 1 no. disabled toilet/staff toilet, and 1 no. staff toilet, (xii) with additional 1 no. toilet that can be accessed from the external play area, (xiii) with storage area in roof area, that is accessed by a pull-down ladder. (B) (i) proposed new stone bellmouth entrance, piers, and walls, from the R209 road, (ii) internal roads and turning heads within the development, (iii) car parking, (iv) 3 no. external play areas with security fencing, (v) bin storage area, (vi) associated signage for facility, (vii) with connection to existing main foul sewer, and all associated site works.
Construct a dwelling house, domestic garage, new entrance onto public road, with connection to services and associated site development works
(1). To retain and complete the domestic garage (parent planning ref 21133). (2). To amend the site boundaries as granted under (parent planning ref 21133) and all ancillary works.
1. To construct a two storey type domestic dwelling. 2. To construct a domestic garage. 3. To construct a new entrance. 4. To connect to existing public foul sewer mains together with all ancillary works
The brief summarizes the pattern across all 162 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 18258The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief