For the erection of a part two storey, part single storey dwelling house with attached carport, detached domestic garage, entrance gates and piers, waste water treatment system with percolation area and all associated site works. Significant further information and revised plans have been submitted to include amendments to the site boundary and relocation of the dwelling, attached carport and detached domestic garage on the site
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Pottle , Poles , Co. Cavan
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
5% of nearby decided applications were refused. The preview found 345 nearby planning records within 5 km where a location match is available.
- Matched source
- 18364
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest planning decisions
Of detached domestic garage and all associated site works
For alteration and extension of existing single storey dwelling; works to include provision of pitch roof to existing garage, associated site development works, installation of new effluent treatment plant and soil polishing filter
1. Erect fully serviced extension to the south elevation of existing dwelling 2. Demolish existing sunroom on the north elevation and construct fully serviced living room and all associated works
For the purpose of infilling of lands at Broughderg, Poles, Co Cavan together with all ancillary structures and site works (incl. new temporary entrance) associated with the above proposed development. Natural materials of clay, subsoil and stone will be used in order to raise the levels and improve the lands for agricultural purposes. The lands will be covered with topsoil and reseeded with grass when completed
For infilling of ground level by an average of 2m, using imported inert material consisting of natural materials of clay, sub soil & stone in order to raise the levels and improve the land for agricultural purposes together with all ancillary site works. The total quantity of material will not exceed 20,000 tonne (class 5 material as per third schedule part 2). The lands will be covered with topsoil and reseeded with grass when complete
The brief summarizes the pattern across all 345 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 18364The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief