Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 321 decisions within 5 km, 4 exact-site or onsite candidate records, and 25 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
25 structured nearby appeal records.
25 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development consisting of construction of a split-level dwelling house with domestic garage, access road, connection to public sewer and all associated site works.
To install a proprietary treatment system and polishing filter in lieu of the connection to public sewer which was previously granted under planning ref:18469. A Natura Impact Statement will be submitted to the Planning Authority within the application
To upgrade existing septic tank by installing a proprietary treatment system and polishing filter in lieu of the connection to public sewer which was previously granted under planning ref: 16496
Development consisting of a change in exterior wall material on lower ground floor from stone to slapdash render (colour - grey) and an amendment to the boundary wall treatment for the previously granted application PL18/252
For development consisting of the demolition and replacement of existing house with a new two storey dwelling house, installation of a proprietary wastewater treatment system and associated site development works
(1) demolition of front single storey domestic garage block and entrance porch, (2) erection of single storey domestic extension to front in lieu of garage block, (3) rear single storey domestic extension and covered external patio, (4) external and internal alterations to existing 2 storey dwelling block, (5) and all other associated site works.
The brief summarizes the pattern across all 321 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18469The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief