Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 89 decisions within 5 km, 1 exact-site or onsite candidate record, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Clare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Clare County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Clare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedNo current-dated citation is loaded for Clare County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
To construct a new dwelling house and garage with a new entrance, sewage treatment system and ancillary works.
To (a) demolish an existing extension to the Northwest side of an existing dwelling house, (b) permission to construct an extension to the Southeast side of the existing house, (c) permission to carry out alterations to the existing dwelling and (d) upgrade the existing sewage treatment system, along with ancillary works
To RETAIN as constructed porch to the front of the dwelling house
To construct an agricultural machinery shed along with associated site works
To construct an agricultural machinery shed along with associated site works
To a). construct a single-storey extension to the side and rear of existing dwelling house, including an astro turf play area to rear of extension, and new private garage; b). demolish the existing private garage; c). close off existing front site entrance and create new site entrance from side road; d). upgrade existing wastewater treatment system; e). provide new stone wall boundary treatment along main and side road frontage; f). all associated site works and services; and RETENTION permission for demolished cottage on site
The brief summarizes the pattern across all 89 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 18515The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief