Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
0% of nearby decided applications were refused. The site check found 12 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
1 NO. FOREST ROAD ACCESS ONTO LOCAL ROAD WITH ASSOCIATED TURNING HEAD AND SECURITY BARRIER
Planning Permission for development consisting of construction of new slatted sheep shed and underground slurry storage tank along with all associated site works.. Proposed slatted sheep shed will have a roof height of 7.714m. All structures are to be built in an existing farmyard.
Construction of a 3 bay slatted shed with underground slurry storage tank along with all associated site works
CARRY OUT ALTERATIONS AND EXTENSIONS TO EXISTING DWELLING HOUSE, DEMOLISH EXISTING GARAGE, UPGRADE EXISTING SEPTIC TANK SYSTEM BY INSTALLING PROPRIETARY EFFLUENT TREATMENT SYSTEM WITH PERCOLATION AREA AND TO CARRY OUT ALL ASSOCIATED ANCILLARY SITE WROKS.
CONSTRUCT NEW DETACHED DWELLING HOUSE AND PROPOSED EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS.
CONTINUED USE OF AN EXISTING GUYED WIND MONITORING MAST, WITH INSTRUMENTS 100M IN HEIGHT FOR A FURTHER PERIOD OF THREE YEARS. THE PURPOSE OF THE MAST IS TO ASSESS THE SUITABILITY OF THE COMPANY'S ADJACENT LANDS FOR WIND FARM DEVELOPMENT. PREVIOUS PLANNING REFERENCE P16/1013
The brief summarizes the pattern across all 12 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18592The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief