Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 224 decisions within 5 km, 1 exact-site or onsite candidate record, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The demolition of existing house and the construction of a new dwelling house, packaged waste water treatment system, polishing filter, a slatted shed and associated site works
The construction of a new single storey dwelling house, on-site wastewater treatment & disposal system, site entrance, driveway and all associated ancillary works
The construction of a dwelling house, waste water treatment system and percolation area, entrance and all ancillary site works.
Works associated with the partial demolition of the original nursing home structure fronting the main road, ground floor lobby on the northern elevation, ground floor electrical room and comms room on the southern elevation and within the footprint of the previously approved nursing home extension. Full planning permission is sought to complete the demolition of the original partially demolished nursing home structure fronting the main road which accommodated 25no. bed spaces and replace with a new structure which will accommodate 18no. bed spaces and ancillary facilities to HIQA standards and infection control and complete all ancillary works associated with the proposed development. Original granted extension planning reference no.s 15/674 & 16/663
[1] minor revisions to the development approved under planning applications Limerick City and County Council (LCC) Reg. Ref. 15/674, 16/663 and 21/175, namely: (a) the reduction of the footprint of the proposed development (by -4sqm, from 464 sqm permitted to 460 sqm retained); (b) revision to the roof layout as a result of the footprint revision and to simplify the eastern elevation (gable end); (c) internal alterations to facilitate the addition of 5 no. beds (from 16 no. beds permitted to 21 no. beds retained); (d) revision to window fenestration as a result of the additional beds (along the northern, eastern and part of the southern elevations); and (e) the addition of 1 no. external plant room and 1 no. emergency exit escape stair along the southern and eastern elevation. [2] PERMISSION for (a) the addition of a new flat roof and guard rail to create a covered first-floor balcony over the existing entrance along the northern elevation, (b) the demolition of 27.608m of existing wall along the R512 and its relocation and reconstruction outside of the visibility splay using the demolished material, maintaining the same appearance, scale and proportion of the demolished wall
The construction of a Four Column Haybarn and ancillary works
The brief summarizes the pattern across all 224 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18610The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief