Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 551 decisions within 5 km, 1 exact-site or onsite candidate record, and 20 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Monaghan County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Monaghan County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Monaghan County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
20 structured nearby appeal records.
20 matchedNo current-dated citation is loaded for Monaghan County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Permission to construct a new play area with play equipment, new play area entrance gates and boundary treatments around the play area, native trees and shrub planting, wildflower planting, grass earth mounds, disable car parking bays, new pedestrian footpaths and all associated works
Planning Permission for: The erection and installation of an adventure activity course, made up of aerial trekking ziplines, nets course, tubing course, and ancillary activities; the erection of a single-storey reception cabin and a single-storey staff welfare cabin; the provision of access routes; and all associated site and ancillary works within Rossmore Forest Park
Permission for development consisting of works to existing 20 number halting sites units to include the following 1) Extensions to 8 number existing halting site units (plot numbers 13-20) to provide bedroom facilities. 2) Conversion of 12 number existing halting site units (plot numbers 1-12) into 6 number 2 bedroom houses. 3) Internal and external alterations to existing units and 4) All associated site development works to include upgraded play facilities. Following development works the total number of dwellings on site will be 14.
Permission to construct stone piers and gates servicing vehicular and pedestrian access to dwelling house and all associated site works
Permission to construct a dry bedded shed for the housing of livestock, within existing farmyard complex, along with associated ancillary site works
Permission to construct a 39 meter lattice mobile and broadband tower with headframe carrying telecommunications equipment together with associated equipment and cabinets enclosed within a 2.4m palisade fence compound on Coillte land. Significant further information relates to the submission of Landscape Character and Visual Impact Assessment and an Eir Technical justification report
The brief summarizes the pattern across all 551 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 188002The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief