Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 280 decisions within 5 km, 1 exact-site or onsite candidate record, and 16 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
16 structured nearby appeal records.
16 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To carry out a Flood Alleviation Scheme which works include the following development: a) The upgrade of the existing surfacewater drainage culvert from the stream to the East to Church Street to the open drain to the rear of Church Road and the Crescent housing estates; b) The inclusion of a new surfacewater drainage culvert from the entrance to St. Joseph's Church Car Park to a new outfall into the Cloonbony River; c) An earthen floof protection embankment is also proposed on lands to the East of Church Street; d) For alterations to the existing surfacewater drainage network; e) Alterations to existing boundary walls within the Miltown Malbay Architectural Conservation Area which would materially affect the character of the area concerned and f) All ancillary site works
To RETAIN the existing external sheds as constructed. PERMISSION is also sought to construct a new front porch along with associated site works
To extend the detached fuel store and all associated site and ancillary works
For change of use from garage/work-shop /fuel store area to deli service/ seating area and new customer toilets and PERMISSION for alterations to the existing shop internal layout, fenestration and elevations of the existing building and PERMISSION to build an extension for new toilets accessible from out-side, new signage and all ancillary and site works
The development will consist of the installation of an ATM machine to the West elevation and a single door to the South elevation of the existing outbuilding (Garage)
Of development at this site. The development consists of a mural on the gable wall of the property
The brief summarizes the pattern across all 280 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 188005The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief