Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 231 decisions within 5 km, 1 exact-site or onsite candidate record, and 16 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Longford County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Longford County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Longford County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
16 structured nearby appeal records.
16 matchedNo current-dated citation is loaded for Longford County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
The construction of 98 no. residential units & crèche to be completed in two phases and all associated ancillary site development works. The 1st phase will consist of (a) 46 no. 2 storey semi-detached 3 bed townhouses, (b) 12 no. 2 storey terraced 3 bed townhouses, (c) 4 no. semi-detached single storey 2 bed townhouses & 1 no. detached single storey 2 bed townhouse, (d) 20 no. 2 bed apartments in 5 no. 2 storey building units, and (d) a mixed use 2 storey building unit consisting of 3 no. 1 bed apartments & crèche with ancillary accommodation. The second phase will consist of 12 no. 2 storey semi-detached 3 bed townhouses on removal of a temporary sewage treatment system. Works will include 2 new vehicular entrances, associated internal access roads & junctions; carparking; footpaths; all boundary treatments and associated landscaping and open spaces; street lighting; associated bin & bicycle stores, a pumping station and temporary sewage treatment system within the site which will be removed on the upgrading of the public foul system; connection to the existing public services; and all associated ancillary site development works
Proposed construction of 1 No. prefabricated building to be used as a main stream classroom together with relocation of existing playground shelter & all ancillary site works
The construction of a new single storey extension to existing school building to accommodate new w/c facilities and all associated site development works
The proposed construction of a vehicular entrance to serve a landholding
The proposed construction of a dormer-type dwelling, proposed vehicular entrance, connection to public foul sewer and surface water services inclusive of all ancillary site works
Proposed retention and completion of existing storage shed to the rear of existing dwelling house and all ancillary works
The brief summarizes the pattern across all 231 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 19202The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief