Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
1% of nearby decided applications were refused. The site check found 176 decisions within 5 km, 2 exact-site or onsite candidate records, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Leitrim County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Leitrim County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Leitrim County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedNo current-dated citation is loaded for Leitrim County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Retain spiral stairs and fire partition to attic storage space within existing dwelling as per condition 2 planning reg. ref. P. 19/215
(a) dormer type dwelling to include attic development and boiler house and, (b) retention of domestic storage area to include all ancillary site work
Construct a single storey type domestic dwelling. (2 ) To construct a domestic garage. ( 3 ) To construct a new site entrance. (4) To connect to existing public foul sewer mains together will all ancillary works
Erect dormer type bungalow with accommodation at attic level, domestic garage, connection to public sewer, provide new site entrance and access road from existing private access road including all ancillary site works necessary to complete the development
For extensions and alterations to petrol filling station and shop layout comprising the following: (a) Single storey shop extension to rear and internal alterations to shop layout (b) Fuel store extension to side and fuel compound to rear (c) Additional fuel pump dispenser, canopy and forecourt pylon signage (d) Alterations to elevations, external stairs and associated works
1. renovate, restore and extend an existing habitable dwelling. 2. To raise the existing roof level in order to the existing attic space into habilte space and convert the house into a one and a half storey private dwelling. 3. Close an existing domestic access and construct a new domestic entrance. 4. To upgrade the existing Waste Water Treatment System to current EPA Code Of Practice and all ancillary works.
The brief summarizes the pattern across all 176 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 19215The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief