Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 1,808 decisions within 5 km, 2 exact-site or onsite candidate records, and 115 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Waterford City and County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Waterford City and County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Waterford City and County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
115 structured nearby appeal records.
115 matchedNo current-dated citation is loaded for Waterford City and County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Works,all within the curtilage of protected structure as described below:forming a new recessed vehicular&pedestrian entrance off Passage Rd; demolition of 20th Century classroom blocks (Glynn,Jacob,Webster,Foster & Penn) on the Wilkin St side of the school complex &construction of a 4624sqm three storey block with general & specialist classrooms & PV panels to roof;demolition of 20th Century entrance block between the Dining hall&Library&the construction of 611sqm two storey entrance block with reception,administration,social/locker areas&staff facilities;demolition of the Southern 20th Century section of the Bio-Laboratory&construction of a 500sqm,single storey Special Needs Unit.The Northern section of the Bio-Lab will be retained as an archive museum;demolition of entrance lobby to Foy Hall&the construction of a 162sqm vertical circulation core&social/locker area;demolition of 4classrooms attached to the swimming pool complex&the construction of a 1149sqm PE Sports/Assembly Hall&a single storey changing&fitness suite with PV Panels to roof;alterations to existing buildings&the construction of a 120sqm part single storey, part 2storey horizontal circulation spine from Wyse House to the Bio-Lab, with an extended covered link to the new classroom block;alterations to the Dining Room&classroom block to form 2 levels with dining facilities,connected with a new staircase,refurbishment of Wyse House&insertion of new lift&part new staircase to facilitate its use as general classrooms&associated facilities.Wyse house is a protected structure, refurbishment of the Library block including the replacement of the two 20th Century roof lanterns.The Library is a protected structure;Relocation of 2 single storey storage containers to the west of the swimming pool&to the east of the new entrance.Total area of new build&refurbishment is 9,289sqm;Provision of hard&soft landscaping with new set down area,car parking,new storm water attenuation system&play areas.Any felled trees will be replaced;Provision of a temporary construction entrance off Wilkin St; Construction of 26no temporary car spaces adjacent to the main entrance for the duration of the construction programme;Provision of a temporary 2 storey modular classroom block&a single storey dining&locker area with a combined floor area of 2,396sqm;Provision of a combined roadway&fire path adjacent to the Wilkin St& PassageRd boundary wall together with a 74sqm extended store&covered yard,new drainage & ancillary works
Extenstion of Duration of pl. file 19/47 for works,all within the curtilage of protected structure as described below:forming a new recessed vehicular&pedestrian entrance off Passage Rd; demolition of 20th Century classroom blocks (Glynn,Jacob,Webster,Foster & Penn) on the Wilkin St side of the school complex &construction of a 4624sqm three storey block with general & specialist classrooms & PV panels to roof;demolition of 20th Century entrance block between the Dining hall&Library&the construction of 611sqm two storey entrance block with reception,administration,social/locker areas&staff facilities;demolition of the Southern 20th Century section of the Bio-Laboratory&construction of a 500sqm,single storey Special Needs Unit.The Northern section of the Bio-Lab will be retained as an archive museum;demolition of entrance lobby to Foy Hall&the construction of a 162sqm vertical circulation core&social/locker area;demolition of 4classrooms attached to the swimming pool complex&the construction of a 1149sqm PE Sports/Assembly Hall&a single storey changing&fitness suite with PV Panels to roof;alterations to existing buildings&the construction of a 120sqm part single storey, part 2storey horizontal circulation spine from Wyse House to the Bio-Lab, with an extended covered link to the new classroom block;alterations to the Dining Room&classroom block to form 2 levels with dining facilities,connected with a new staircase,refurbishment of Wyse House&insertion of new lift&part new staircase to facilitate its use as general classrooms&associated facilities.Wyse house is a protected structure, refurbishment of the Library block including the replacement of the two 20th Century roof lanterns.The Library is a protected structure;Relocation of 2 single storey storage containers to the west of the swimming pool&to the east of the new entrance.Total area of new build&refurbishment is 9,289sqm;Provision of hard&soft landscaping with new set down area,car parking,new storm water attenuation system&play areas.Any felled trees will be replaced;Provision of a temporary construction entrance off Wilkin St; Construction of 26no temporary car spaces adjacent to the main entrance for the duration of the construction programme;Provision of a temporary 2 storey modular classroom block&a single storey dining&locker area with a combined floor area of 2,396sqm;Provision of a combined roadway&fire path adjacent to the Wilkin St& PassageRd boundary wall together with a 74sqm extended sto
Indefinite Retention of a single storey fuel store located behind the approved detached hobbies room/garden store at rear
A single storey extension to side and rear of existing house with all necessary associated refurbishment and site works including removing existing garage, together with widening the existing site entrance
As constructed entrance gates together with adjoining walls and all associated site works (subject to previous planning permission reference number 16/620 on the site located at
For works comprising the demolition of the existing single storey garage to the side (northwest) of the existing dwelling house and the construction of a new 2 storey extension tot he side (north west)and rear (northeast) of the existing dwelling house, together with all ancillary and associated site works
The brief summarizes the pattern across all 1,808 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 1947The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief