Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
16% of nearby decided applications were refused. The site check found 324 decisions within 5 km, 8 exact-site or onsite candidate records, and 34 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matched1 of 2 layers are loaded for Waterford City and County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Waterford City and County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Waterford City and County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
34 structured nearby appeal records.
34 matchedNo current-dated citation is loaded for Waterford City and County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Retention permission for site development works as constructed and planning permission to complete the site development works for 14 no. sites all as previous Planning Permission Ref. 99/17 and Pl.24.119683
The construction of a single storey split level dwelling house, new vehicular and pedestrian entrances, new landscaping and boundary treatments, installation of solar panels, connection to public sewer and inclusive of all ancillary accommodation and associated site works (this development has been previously granted full planning permission under 06807) on site
For alterations to the front (North) elevation (removal of timer paneling under windows and the resizing of the existing lounge window) and for the construction of a single storey extension of area 18.45 sqm and relocation of the external sliding doors to the side (Eastern) elevation. All with associated site development works to property
A change of use of existing restaurant to 4 no. holiday units and all ancillary site works
Change of use from existing restaurant to 3 no holiday units and all ancillary site works
The proposed erection of a fully serviced, 5 bedroom two storey (ground floor level and basement) detached dwelling with two storey (ground floor level and first floor level) guest house with a shared entrance at ground floor level, external garage, terraces, storage area, leisure areas, provision of new vehicular entrance, landscaping and services connections, together with all other associated site works
The brief summarizes the pattern across all 324 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 20131The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief