Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 868 decisions within 5 km, 6 exact-site or onsite candidate records, and 51 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched1 of 2 layers are loaded for Carlow County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Carlow County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Carlow County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
51 structured nearby appeal records.
51 matchedNo current-dated citation is loaded for Carlow County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
To develop 78 apartments and associated landscaping, drainage, bin enclosure, boundary treatments, roads, lighting & site works, including an ESB sub-station, at the former Greenvale site on Montgomery Street, Carlow Town. The site is bordered by Montgomery Street to the South and the Barrow Track to the West and a rear boundary wall adjacent to Hazel Court to the North and West. The apartments are accommodated in 3 blocks (A, B & C) ranging in height from 4 to 6 storeys. The intermediate public spaces between each block and associated landscaping link the communal amenity spaces of the site to the Barrow Track. 38 No. surface car parking spaces are provided to the rear (North West) of the site and are screened from Hazel Court to the North with a boundary wall and tree screening. There is also provision for 40 bicycle parking spaces distributed around the site. Block A to the South has a gross internal floor area of 2,040 sq.m and is comprised of 3 No. one bedroom units, 16 No. two bedroom units and 2 No. three bedroom units and ancillary circulation & plant room spaces and ranges in height from 4 to 5 storeys. Block B in the middle of the site has a gross internal floor area of 2,589 sq.m and is comprised of 3 No. one bedroom units. 22 No. two bedroom units and 2 No. three bedroom units and ancillary circulation & plant room spaces and is 6 storeys in height. Block C to the North of the site has a gross internal floor area of 2,842 sq.m and is comprised of 8 No. one bedroom units and 22 No. two bedroom units and ancillary circulation & plant room spaces and ranges in height from 4 to 6 storeys. This application is accompanied by a Natura Impact Statement (N.I.S.).
Permission for (1) the demolition of existing 2-storey industrial buildings, (2) the construction of 32no. dwelling units consisting of 2no. one-bed (single-storey) duplex apartments and 13no. two bed (single-storey) duplex apartments, 15no. three bed (2-storey) duplex apartments, 2no. three bed (semi-detached) townhouses, (3) car parking with new vehicular entrance (4), boundary treatments, (5) bicycle storage provision and storage outbuildings, (6) soft and hard landscaping, (7) ESB provision, (8) connection to existing site services and all ancillary site development works
The development will consist of alteration to previously approved under planning Ref: 23/60101. Alterations include amendments to demolition works, revised number of units, site boundary, elevations, external storage building and all ancillary works
For proposed widening of existing pedestrian entrance to accommodate a vehicular entrance, widening of existing opening in front boundary wall, proposed new gates to same, widening of driveway and all associated works (being within an ACA)
A new single storey four bedroom dwelling, new residential site entrance plus all associated site works including all over ground / underground services to facilitate the development
Consist of a) Solar photovoltaic panel to be affixed to the existing roof surfaces covering a maximum area of 800m2, b) installation of new containerised storage unit measuring 2.5x2.6x6.1Lm steel container located to the rear of the demise to house batteries to store electricity, c) installation of 1 nr. 50KW fast charger to allow both An Post Vehicles to charge and member of the public, which will be located to the right hand side of the existing entrance to the property
The brief summarizes the pattern across all 868 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 20294The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief