Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 123 decisions within 5 km, 2 exact-site or onsite candidate records, and 9 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Roscommon County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Roscommon County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for Roscommon County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
9 structured nearby appeal records.
9 matchedNo current-dated citation is loaded for Roscommon County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Permission for development for a period of twenty four years consisting of two no. extensions to the south and west of the existing quarry with a total extraction area of 8.60ha, a berm along the southwestern side of the southern extension, all associated site development and landscaping works. (The application has been accompanied by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) at
Retention permission for the installation and operation of the asphalt plant (replacing the previously permitted asphalt plant granted pursuant to Reg. Ref. No. 08/474 and all associated plant and infrastructure including aggregate storage shed (approx. 840.43 sq. m.), operator control cabin (9.31 sq. m.) and ancillary works on a c. 1.47 ha. application site within the existing quarry in the townlands of
Permission for the installation and operation of an asphalt plant and all associated plant and infrastructure including operator control cabin (16.25 sq. m) and ancillary works on a c. 1.6 ha application site within the existing quarry in the townlands of
Permission for the construction of the aggregate drying structure (approx. 329.05 sq.m.) and all associated site development works on approx. 0.69 ha application site within the existing quarry at
Permission for the construction of the plant storage canopy (approx. 293.09 sq.m.) and all associated site development works on approx. 0.40 ha. application site within the existing quarry in the townlands of
1. Retention Permission to retain existing building used in conjunction with the existing piggery containing workshop, office space, wash room and staff area and 2. Planning permission to upgrade the existing waste water treatment system and percolation area and the application comprises of an activity, which requires a Waste Licence Permit - EPA Licence No. P0515-02, together with all associated site works at
The brief summarizes the pattern across all 123 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 20310The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief