Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 77 decisions within 5 km, 4 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
THE CONSTRUCTION OF A DWELLING DOMESTIC GARAGE AND TREATMENT SYSTEM
On Grant of Outline Permission Reference No. PL2/20/491 for the Construction of a dwelling, domestic garage, and treatment system
DEMOLITION OF EXISTING FRONT PORCH AND CONSTRUCTION OF A NEW SIDE PORCH AND REAR EXTENSION TO EXISTING DWELLING HOUSE & CONSTRUCTION OF A DOMESTIC GARAGE, INSTALLATION OF TREATMENT SYSTEM WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS
THE CONSTRUCTION OF A DWELLING HOUSE & DOMESTIC GARAGE, TREATMENT SYSTEM WITH PERCOLATION AREA AND PROPOSED CONNECTION TO EXISTING WATER MAINS AND ALL ASSOCIATED SITE WORKS
NEW DWELLING HOUSE, DOMESTIC GARAGE/FUEL SHED, INSTALL SEPTIC TANK WITH PERCOLATION AREA AND ALL ANCILLARY STE WORKS
CONSTRUCTION OF A MILKING PARLOUR, DAIRY & ANCILLARY ROOM, DRAFTING & HANDLING FACILITIES, WAITING YARD & UNDERGROUND SLATTED TANK AND ERECTION OF MEAL BIN AND ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 77 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20491The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief