Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 157 decisions within 5 km, 1 exact-site or onsite candidate record, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To erect fully serviced two storey dwelling with detached domestic garage, entrance, sewerage treatment facilities and all ancillary works
For single storey extension to front of existing school building incorporating SEN Base classroom, multi-sensory room, offices, toilets and associated accommodation, sensory garden, extend existing carpark, connection to existing services and associated site works
For development consisting of single storey block incorporating classroom, toilets, circulation areas, external canopy, connection to existing services and associated site works
For developing playground facilities, pathways, fencing and all associated and ancillary works
Of 1) re-opening and expansion of existing rock quarry, 2) extraction of rock by means of modern blasting and hammering techniques, 3) onsite processing to crush and screen materials and associated mobile processing plant, 4) construction of new access road and new entrance onto the R394, 5) provision of site office and welfare facilities, 6) construction of a weighbridge, 7) construction of a settlement pond, 8) all ancillary site development works
To develop a new graveyard complete with associated siteworks, access pathways, boundary walls and gates
The brief summarizes the pattern across all 157 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20526The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief