Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 263 decisions within 5 km, 4 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched1 of 2 layers are loaded for Monaghan County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Monaghan County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Monaghan County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedNo current-dated citation is loaded for Monaghan County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Permission to construct a two storey dwelling house, detached domestic garage, proprietary waste water treatment system, site entrance on to existing public road via existing private laneway and all ancillary site works and planning permission to retain existing mobile home for use as temporary living accommodation in conjunction with planning permission for the dwelling house. Significant further information relates to the removal of PP to retain existing mobile home for use as temporary living accommodation and revised site layout plan and location maps.
Permission to retain existing mobile home for use as temporary living accommodation in conjunction with planning permission for the dwelling house, planning ref. 20/558
Permission for the construction of additional 6 no. two-storey semi-detached dwelling houses at Drumakelly Housing Development, connection into existing foul water treatment system and storm water disposal system, provision of access road to connect into existing access road, use existing entrance/exit onto public road together with all ancillary site development works
Permission for a side and first floor extension to the side of an existing dwelling house and associated site development works
Permission to construct a single storey extension to the side of the existing Parish Hall, proprietary waste water treatment system and all ancillary site works
Permission to construct a dormer style dwelling house, detached domestic garage, wastewater treatment system and percolation area, boundary fencing, use of existing laneway and entrance and all associated site works, Significant Further information relates to submitted, Flood Risk Assessment Report, Soil Characterisation & Site Suitability Assessment Report, also submitted proposed Site layout Plan & Proposed garage plans, Elevations & sections
The brief summarizes the pattern across all 263 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 20558The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief