The construction of 6 cattle underpasses and 1 cattle overpass. The underpasses will consist of concrete culverts beneath the Greenway surface to allow cattle crossing and to maintain the safety of pedestrian and cyclist users of the Greenway
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Garranekeevan Dromin (macturlogh) Doonakenna Knocknasnaa and Port , Great Southern Greenway , Co. Limerick
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
5% of nearby decided applications were refused. The preview found 174 nearby planning records within 5 km where a location match is available.
- Matched source
- 208006
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
The construction of a new dwelling, garage, waste water treatment system, vehicular entrance and all associated site works
To construct a single storey dwelling house, detached domestic garage, install mechanical aeration unit and polishing filter system, utilise existing vehicular entrance / access road off public road with new site entrance off existing access road with all associated site works
The demolition of existing straw bedded shed and open slurry pit and to construct cattle crush, slatted shed, feed passage, creep area and concrete aprons
The construction of a straw bedded shed, feed passage, and concrete aprons
Domestic extension, extension of domestic garage and shed and all ancillary site works
The brief summarizes the pattern across all 174 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 208006The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief